Electrical Project Value – £1,000,000
This fast tracked project was complete within a total of 16 weeks, consisting of a new build 2 storey courtyard infill. R P Bray carried out the installation of two new 630A switchboards complete with new SWA wiring varying in size from 25mm to 300mm and a total of 1700m of new containment throughout the project. R P Bray also carried out the total install of the following – IPS/UPS, Fire Alarm, Data, CCTV, Access Controls and Lightning protection. Two new GRP enclosures were added to the roof space to house the associated UPS backup system for the new infill area, complete with new air conditioning. Additionally a new AHU supply was installed to the roof space where R P Bray also installed a new auto change over switch to feed the new AHU with a backup supply on standby. Over 27,000 meters of cable has been installed on this project varying from 2.5mm – 300mm.